Martek served as the IOT&A contractor to successfully outfit, transition and activate this highly visible 1.25 million SF project. Martek performed all work on time and within budget despite a number of modifications and changes requested throughout the project.
Fort Campbell, Kentucky
60,000 SF Mother Baby Expansion and Renovation Building
Martek is IOT contractor responsible for all initial outfitting and transitioning of this new addition and renovation. Despite construction delays Martek worked with the customer and general contractor to ensure the IO&T portion and project was completed on time and within budget.
United States Army
Fort Campbell, Kentucky
25,000 SF NICOE Center
Martek was selected to perform all IO&T services for this National Intrepid Center of Excellence (NICOE) sponsored and funded by The Fisher House. The multi-disciplinary centers exist to gain an understanding of and healing the invisible wounds of war, particularly Post Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). The center primary function helps and rehabilitate veterans using ancient technology like meditations yoga and exercise to the latest modern technology such as magnetoencephalography, MRI and PET scans. Project was delivered on time and within budget.
Curtiss Wright Corporation
113,000 square-foot build to suit office and testing facility
Idaho Falls, Idaho
Martek was an At-Risk developer for this ground-up build to suit project for a highly specialized office space, assembly and scientific testing for Fortune 500 world leading company focused on the energy and aviation industry. Facility has been recognized for national awards that include Best Project from Tilt-Up Concrete Association and Idaho Business Review for Top Project 2014.
Project was delivered on time under budget Entire project was 11 months and 11 days. Martek provides asset and property management for this building.
US Geological Survey
Huron, Ohio
7,000 SF special office, laboratory, and deep-water research vessel berthing.
Martek was the At-Risk developer and general contractor on this project. After 25 years located in multiple separate facilities US Geological Survey turned to Martek to provide full redevelopment to accommodate extremely difficult set of requirements. Martek redeveloped and provided all design build aspects of the property which included building expansion of office space, laboratory, warehousing, locker room and shower facilities and secured ware yard, marine yard, and dockage.
Martek designed and delivered all furnishings and furniture for the new headquarters of Coastal Sunbelt. Martek provided full design services, product selection, delivery, installation, and turnover. Project was completed on time and within budget.
Homeland Security (GSA)
10,000 SF specialized secured facility
Idaho Falls, Idaho
Martek was At-Risk developer for the acquisition and major renovation to accommodate the special needs of this highly secured facility. Martek delivered this correct on time within budget while dealing with the worst winter conditions Idaho experienced in more than 75 years.
Homeland Security
El Centro California
160,000 SF Major renovation of dormant detention center
Martek performed a major renovation to a dormant 525 bed detention center in southern California. Site grading and drainage planning and execution, concrete work to include external drains and construction of a basketball court, asphalt resurfacing for the perimeter accessways and parking areas, painting of the internal and external surfaces for the entire site. The team provided interior & exterior lighting; Replaced and provided electrical and plumbing to 6 guard houses; Updated Heating, Ventilation, & Air Conditioning (HVAC) and controls; Water softening systems; Fire protection & life safety; Roofing & waterproofing systems; Doors, door hardware and locking systems; Security camera and access systems; Medical ventilation certification and dental air. We updated multiple detention dormitories, updated a large food service and dining facility and a medical/dental facility.
Veterans Affairs
Long Beach California
Martek provided Outfitting and Activation services for the Long Beach VAMC, outfitting an Audiology, Eye Clinics and Sleep Study areas in building OP126, and featuring 6 audiometric exam suites, 26 eye testing/exam/treatment rooms and 6 sleep lab rooms. Finishing on time and under budget.
Veterans Affairs
Lincoln Nebraska CBOC
Martek served as the IOT&A contractor for a 70,00 SF CBOC to replace a 90-year-old facility. We provided Comprehensive Furniture, Fixtures, and Equipment (FF&E) Planning Support; Acquisition Services; Concept of Operations (CONOPS) and Transition Planning; Relocation Services; Installation services, and Strategic Communications (STRATCOM) Support Services; Relocation Services; Comprehensive Warehousing Management Services; Delivery, Installation, Testing, and Training Services; Training and Simulation; Final Turnover, Close-out, and Post Occupancy Evaluation (POE) Services. Additionally, Martek affected the disposition of 250,000 SF of excess equipment and furnishings valued at more than $6m. All services were completed early and under budget.
Veterans Affairs
Birmingham Mental Health Clinic
As the IOT&A Contractor for a new 60,000 SF Mental Health Facility, Martek provided Comprehensive Project Management Support; Design and Planning; Comprehensive Furniture, Fixtures, and Equipment (FF&E) Planning; Acquisition; Concept of Operations (CONOPS) and Transition Planning; Strategic Communications (STRATCOM) Support Services; Warehousing, Delivery, Installation, Testing and Training plan, Training and Simulation Plan, Training Reports, Technical RFI Assistance, Final Project Lessons Learned, and Project Documentation Transfer. Completing the project on time and in budget.
Veterans Affairs
Palo Alto California
Martek was the contractor for a 95,000 SF Biomedical Research Building with a 50,000 SF vivarium laboratory. We provided inspection, storage, moving services, and installation services of new and existing Equipment, Fixtures, and IT items. Additionally Martek coordinated high level, aerosol, bacteriostatic cleaning of the vivarium prior to movement of test animals.
U.S. Army Corps of Engineers
Iquitos, Peru
Naval Medical Research Laboratory 6
Martek served as the IO&T contractor for a 12,000 SF medical research lab in Iquitos Peru. Activities included initial inventories, space planning , procurement planning and purchase of all FF&E, and installation, testing and training. This contract was executed at the height of the pandemic. The team expertly navigated through delays from country closures, logistics and distribution challenges moving large amounts of equipment into the Amazon basin and construction delays and kept the project significantly under budget.
U.S. Army Corps of Engineers
Holistic Health and Fitness Initiative
In support of the Army Chief of Staff’s initiative, Martek is providing Comprehensive Project Management Services; Comprehensive Equipment Planning; Equipment Purchasing; Delivery of equipment and Close-Out Services for Brigade level Holistic Health and Fitness units across the country. The equipment provided will be delivered to 40 brigades in 10 locations across the U.S., valued at $8.6 Million.
Veterans Affairs
Jacksonville, FL CBOC
Martek serves as the IOT&A contractor for a new 150,00 SF CBOC to replace three smaller clinics. We are providing Comprehensive Furniture, Fixtures, and Equipment (FF&E) Planning Support; Acquisition Services; Concept of Operations (CONOPS) and Transition Planning; Relocation Services; Installation services, and Strategic Communications (STRATCOM) Support Services; Relocation Services; Comprehensive Warehousing Management Services; Delivery, Installation, Testing, and Training Services; Training and Simulation; Final Turnover, Close-out, and Post Occupancy Evaluation (POE) Services.
Veterans Affairs
New Port Richey, FL CBOC
Martek serves as the IOT&A contractor for a new 114,00 SF CBOC to decompress the impact on the VAMC. We are providing Comprehensive Project Management Services; Comprehensive Furniture, Fixtures and Equipment (FF&E) Planning Support; Acquisition Services; Concept of Operations (CONOPs) and Transition Services; Relocation Services and Move Plan Implementation; Warehouse and Warehousing Services; Training and Orientation; Activation, Installation and Relocation Services.
Professional Services
Smithsonian Institute
Space Shuttle Relocation and Retirement
Space Shuttle Endeavour was ferried by NASA’s Shuttle Carrier Aircraft (SCA) over Houston, Texas on September 19, 2012, during a three-day flight to Los Angeles California and finally road transportation where the retired shuttle was put on public display at the California Science Center Museum.
Martek was honored to support the Space Shuttle Endeavour for its final journey. Relocating the national icon and precious historic spacecraft was all about making certain that the proper acquisition planning was developed, executed and in place. Martek successfully ensured that NASA acquired all services and right-of-ways to allow for the safe and efficient relocation of Endeavour’s successful journey and final retirement location.
Department of the Interior
Acquisition Services Directorate (AQD)
20 years of acquisition, financials and budget support
Martek’s relationship with AQD spans over 20 years of experience providing assisted acquisition support for AQD’s federal government customers. We provide hands-on customer service in a collaborative environment, from project initiation to contract close out. Martek’s contracting experts have been a leader in the full acquisition and financial areas of AQD organization since its early inception. Martek constantly achieves agency goals and provides support in the areas of assisted acquisition support, business, financial, policy and closeout support.
Federal Aviation Administration
Fort Worth, Texas
The Federal Aviation Administration (FAA) requires Logistics Support for the National Airspace System (NAS) and other Capital Improvement Projects (CIP). Martek’s Acquisition and Business Services provides cross-organizational leadership to ensure that operational programs supported by multiple lines of business are delivered on time, efficiently, and effectively. The FAA’s Acquisitions and Business Services (ACQ) initiatives reflect a commitment to the President’s Agenda for a more results-oriented and efficient government.
Martek support includes real estate support, executing capitalization activities and accomplishing drawing/design support for space management at the three FAA Logistics Service Areas (LSAs) located in Atlanta, Ft. Worth, and Seattle in addition to, the William J. Hughes Technical Center in Atlantic City; New England Region (Boston); Great Lakes Region (Chicago); and the Mike Monroney Aeronautical Center in Oklahoma City.
Solicitors Office
Washington DC
Office of the Solicitor (SOL) consists of the Solicitor, the Deputy Solicitors, Associate Solicitors, Counselors to the Solicitor, Special Assistants, Executive Assistants, Program Assistants, Attorney Advisors, Paralegals and various Administrative and Staff Assistants. Each division has different responsibilities and provides legal services to different client-representative bureaus and offices within the Department.
Martek provides a large workload of document collection, review, and modification and legal analysis and, title opinions, as well as a need for overall administrative support services. Additionally, IT and facilities operations support services, and special projects have been provided during the contract performance.
Technology
NIST
Facilities Management System Implementation
In this 5-year contract, Martek is providing services to implement the Nuvolo® facilities management modules for NIST’s Office of Facilities and Property Management (OFPM). This Solution as a Service (SaaS) project will migrate information from three existing applications into one enterprise facilities management system with follow on support and helpdesk functions.